From: route@monster.com
Sent: Thursday, October 01, 2015 3:58 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tester
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
TECHNICAL
SKILLS: ·
Ericsson Tools: ERTT (Ericsson RF Tracking Tool),
TRAMS, CANA, NEWTUNE, ENIQ, NEAT Tool, NDS Tool, SANE ·
Sprint Tool: Falcon ·
RF Tools – Nortel CDMA Access Configuration
and Provisioning Application (CACP), Common Provisioning System (CPS),
MapInfo, Google Earth, RF Cockpit, WPS, RF Sync Qualcomm Extensible
Diagnostic Monitor (QXDM), Delorme Street Atlas, TEMS Investigation 14 ·
Data Processing Tools: Actix,
WindCatcher, EDAT ·
Operating Systems: Windows 98,
2000, XP, Vista, Windows 7, Mac, Unix, MSDOS ·
Network Protocol: FTP, LAN, WAN, WiFi, Wireshark
analyzer, network troubleshooting ·
Languages: C, C++. ·
Software: MS Office (Access, Word,
Excel, Power Point, Outlook), Adobe Applications, Matlab. ·
Design Tools: OrCAD, CADSTAR, EAGLE, AUTOCAD ·
Architecture: Microprocessor and Microcontroller
Family ·
Programming: Microprocessor and Microcontroller EDUCATION Masters of
Science, Electrical Engineering- Emphasis on Telecommunication
May-2012 California
State University, Fullerton, CA Bachelors
of Engineering, Electronics and Communication
July-2009 South
Gujarat University, Gujarat, INDIA PROFESSIONAL
EXPERIENCE: MobileNet
Services, Inc.Irvine, CA
August 2013 – Present RF Engineer
I.
Verizon
Carrier harvesting (Ericsson) for So-Cal
Markets [June
2015 – Present] Responsibilities: · Creating
a master tracker with all the source and destination sites along with the
required licenses and site configuration · Creating
an OM report and comparing with Baseline report to check the site performance · Session
files and EMS audit using SANE · Scripting
for BTS and DOM using CACP and CPS Tool · Licenses
count required and removal track · Customer
and NIC team support
II.
Ericsson
Sprint Network Vision – CPM/ Break Fix & 1900/800 Band RF Optimization
for Miami/South West Florida/Gulf Coast/New Orleans/Jacksonville and the
Panhandle Market
[December 2014 –
June-2015]
Responsibilities: · Performance
check and optimization on all CPM/ERC tickets for all markets · CMC
and CSMS ticket request to make market level or site level parameter or any
performance related changes. · ERTT
and TRAMS Ticket creation to keep all high runner sites at same page for
Sprint and Ericsson Teammates · Providing
performance check and Optimization on 1900 and 800 Band daily top offender
Sites · Site
audit to check configuration and all parameters using Nortel CDMA Access
Configuration and Provisioning Application (CACP). · Providing
data fill recommendations on sites showing incorrect configurations after cut
such as neighbor list updates, power adjustments, hard hand off parameters,
and essential golden parameters. · Report
management, call block, call drop, call attempt and call failure on sites to
find issues using RF COCKPIT/ RF Sync for CDMA and ENIQ for LTE performance · Generate
XMU and RBS using Neat and OSS Reports for migrated sites to find hardware
alarms. · Check
for correct PCI, swapped sectors, Newton plots, antenna electrical and
mechanical tilt factor and transmit power validation. · Assist
NIC in providing sites showing hardware alarms in order to get issues
resolved III.
Sprint
ATP Data Processing and Optimization (ALU) for Multiple Markets
[October 2014 – December 2014]
Responsibilities: · Data
Processing for Pre-Launch Sites using eDAT (x64) · Sector
level stationary tests to perform DL, UL, Setup and Ping Testing · Checking
intra site inter sector Handovers using clockwise and counter-clockwise round
around site using eDAT (x64) · Creating
report for all data driven along with all the Site information · Coordinating
with Drive Testers while testing by checking the data has been provided · Sector
swap and Azimuth rotation issues · Troubleshooting
with Drive Testers · Drive
route for design for clusters using MapInfo and Street atlas IV.
AT&T
LTE /UMTS Data Processing and Optimization (ALU) for PNW Market
[August 2014 – October 2014]
Responsibilities: · Preparing
whole Pre and Post Processing plan for individual Site or Cluster · Creating
Polygon and Drive plan for individual/ Cluster Site using MapInfo tool · Making
Exit Routes for Inter, Intra and IRAT for Site · Creating
Neighbor List using WPS tool · Data
Processing and analyzing with Actix tool · Generating
ANOVA Report for KPI Values and other parameter audit · Final
report for whole Pre and Post Data Processing for SSV or Cluster Site · Coordinating
with Drive Tester on Drive Plan and Data Processing · Optimizing
Sector/Site for better coverage
V.
Sprint
Network Vision (Ericsson) – RF Optimization for Atlanta/Alabama Market
[March 2014 – August 2014]
Responsibilities: · Provided
Optimization on daily Top Offender sites · Troubleshooting
with Field Engineer and NIC on sites showing issues · Site
audited to check configuration and all parameters using Nortel CDMA Access
Configuration and Provisioning Application (CACP). · Provided
data fill recommendations on sites showing incorrect configurations after cut
such as neighbor list updates, power adjustments, hard hand off parameters,
and essential golden parameters. · Report
management, call block, call drop, call attempt and call failure on sites to
find issues using RF COCKPIT. · Generated
XMU and RBS Neat Reports for migrated sites to find hardware alarms. · Checked
for correct PCI, swapped sectors, Newton plots, antenna electrical and
mechanical tilt factor and transmit power validation. · Assisted
NIC in providing sites showing hardware alarms in order to get issues
resolved. VI.
Sprint
Network Vision Stationary Testing (ALU) – Los Angeles
Market
[February 2014- March 2014]
Responsibilities: · Stationary
Testing for Sprint’s LTE network for Southern California markets. · Sector
level stationary tests to perform DL, UL, Setup and Ping Testing · Checked
intra site inter sector Handovers using clockwise and counter-clockwise round
around site drive · Performed
site baseline drive tests using QxDM and Wireshark Network Protocol. VII. Sprint Network Vision (Ericsson) – RF/Cluster
Optimization for Kansas Market
[September 2013 – January 2014]
Responsibilities: · Cluster
Optimization. · Provided
RF engineering support during the migration of Nortel Legacy BTS equipment to
Ericsson RBS equipment. · Troubleshoot
with Field Engineer and NIC on sites showing issues after being converted to
RBS equipment. · Site
audited to check configuration and all parameters using Nortel CDMA Access
Configuration and Provisioning Application (CACP). · Provided
data fill recommendations on sites showing incorrect configurations after cut
such as neighbor list updates, power adjustments, hard hand off parameters,
and essential golden parameters. · Report
management, call block, call drop, call attempt and call failure on sites to
find issues using RF COCKPIT. · Generated
XMU and RBS Neat Reports for migrated sites to find hardware alarms. · Checked
for correct PCI, swapped sectors, antenna electrical and mechanical tilt
factor and transmit power validation. · Assisted
NIC in providing sites showing hardware alarms in order to get issues
resolved. VIII. Sprint Network Vision (Ericsson) -
Scripting
[August 2013 - September 2013]
Responsibilities: · SNV
project using Ø CACP (CDMA
Access Configuration and Provisioning application) versions 18.04p50 &
18.06. Ø CPS (Common
Provisioning System) for EVDO Global System Rel1.1 V1.1.0. Ø CPS (Common
Provisioning System) for 1xEV-DO V10.1. · Generated
scripts required to add and configure the RF parameters for each sites. · Generated
neighbor list scripts for surrounding sites. · Worked
closely with the Network Integration (NI) team to provide troubleshooting
support during the conversion. Myers Power
Products, Inc.Ontario, CA October 2012 – August 2013 Project Engineer Responsibilities: ·
Worked on Southern California Edition PEBBLY BEACH 15KV
Switchgear project. ·
Medium voltage Switchgears designing for LA Glendale water
Plant Project. ·
Interpretation and direct dealing with customer and
vendors for project related topics. ·
Electrical Drawing using AUTOCAD. ·
Worked on single line and three-line diagram. ·
Analyzed and interpreted with wiring diagram and bill of
materials. ·
Documentation using MS tools. Pacific
Power Products, Inc.Santa Fe Springs, CA
July 2012 – October 2012 Project
Engineer Responsibilities: ·
Electrical Drawing using AUTOCAD for medium voltage and
low voltage switchgear ·
Customer management related to requirements ·
Worked on single line and three-line diagram. ·
Analyzed and interpreted with wiring diagram and bill of
materials. ·
Documentation using MS tools. Maharshi
Electronics.Ahmadabad,
Gujarat-INDIA
July 2008 – May 2010 Electronics
Design Engineer Responsibilities: ·
Electronics designing using AUTOCAD and CADSTAR for small
and medium requirement projects from ISRO (Indian Institute of Science and
Research Organization) ·
PCB layout and designing ·
Soldering and testing for all project devices ·
Customer management related to requirements ·
Analyzed and interpreted with wiring diagram and bill of
materials ·
Documentation using MS tools. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Intermediate |
|
|
Hindi |
Fluent |
|
|
|